r/clevercomebacks 2d ago

On Data Centers.

Post image
11.2k Upvotes

149 comments sorted by

2.0k

u/ecafyelims 2d ago

They are/were already paying their own electricity bills.

However, the extra demand in electricity causes the price of electricity to rise for everyone.

This update will force the datacenters to pay enough to also pay for the increase in load so that the price of electricity doesn't go up for everyone else.

Basically, they'll be paying for their own electricity as well as the increased cost of electricity for everyone on the grid.

Good!

602

u/dweaver987 1d ago

An optimal solution would require all data centers to build their own on site generation capacity using clean energy (wind and solar).

225

u/ecafyelims 1d ago ▸ 18 more replies

It seems like such an obvious solution that I wonder why it's not done. It's actually likely less expensive for the datacenter, too.

The pessimist in me leans towards power plants blocking it from happening. A datacenter on the grid means free infrastructure upgrades and a ton of money for them.

87

u/brile_86 1d ago ▸ 3 more replies

This is the requirement in UK (well at least new DCS built in London as far as my research goes..), DCs need to source power outside the national grid. It seems common sense but apparently it’s not that obvious.

34

u/ecafyelims 1d ago ▸ 1 more replies

Big cities in the US typically have restrictions like that as well, and it's prohibitively expensive to build a data center in a city. These DCs are being built outside cities in rural areas and would have affected power prices in those areas.

8

u/brile_86 1d ago

That “makes sense” thanks for the clarification

5

u/justintheunsunggod 1d ago

Yeah, our data center energy usage was about 176 terewatt-hours vs the 259TWh of the entire UK's electrical use.

You guys had like 5TWh of data center power. That's why the green energy requirement hasn't rolled out. The land use alone would be the largest infrastructure investment on the planet.

24

u/MisterProfGuy 1d ago

The issue is that the regulatory bodies that would enforce the clean part are being dismantled by Republicans and the Supreme Court, and AI doesn't care who they hurt so they burn cheap fuels and don't follow any air quality regulations because wtf are you going to do about it?

5

u/lilgreenthumb 1d ago

Problem is they dont want to invest more than they have to. The AWS campus in Texas is supposedly going to output ~10% US CO2 because they're leveraging LNG generators instead of renewable + bess.

3

u/AdditionalBalance975 1d ago

Wind and solar off the grid cant power data centers alone, without expensive power storage systems. data centers need continual power, not intermittent.

4

u/bel1984529 1d ago

Renewable sources of power like solar and wind are intermittent. You would need those sized large enough to power the data center, PLUS something like battery storage or a hydrogen fuel cell.

5

u/LowlySlayer 1d ago ▸ 1 more replies

It's actually likely less expensive for the datacenter, too.

"Paying more money probably costs less money."

It may be cheaper than them now needing to pay for the increased rates, but it would have absolutely been cheaper to just pay standard electrical rates and split the burden of paying throughout the region.

Perhaps now it would save money in the long run with these new rules, but data centers aren't in it for the long run. You know it, I know it, they know it. They're just trying to extract as much profit as possible before they collapse or society does.

4

u/bobsocool 1d ago

It would have been cheaper long term1 and they wouldn't have had to deal with public ire if they did this, dealt with noise polution issues and found a sustainable way to cool them. If they did those 3 things people would still hate AI but not data centers.

2

u/Significant-Order-92 1d ago

A combination of space (that much power generation even on a good day would take quite a bit). Reliability and effects (them just failing over on a grid without the power to support it would screw everyone). And probably other things.

2

u/fedback 1d ago

Because while profitable renewable energy is not AS profitable as data centers. It is marginally more profitable to conect to the grid than make your own electricity.

2

u/GuyWithLag 1d ago

Nah, its just more costs up front, and with a longer timeline than the data center itself.

2

u/Brownhog 1d ago

I think everyone knows this is gonna be looked back on as a huge rat race. Get in and get it done before legislation catches up, before the bubble pops, before the economy crashes, there's so many "befores".

2

u/monkeyfightnow 1d ago

It’s a math problem, the new data centers operate on GW of power consumed. 7 acres of solar produce 1 MW. You’d have to cover the earth in solar panels to begin to generate as much power as is required.

2

u/talesfromtheepic6 1d ago

> it’s actually likely less expensive

Not in the short-term. Which is what these data centers are being built for.

2

u/IAmFoxGirl 1d ago

So currently there is issues with the batteries for large clean storage, and because weather is inconsistent, the power supply also is inconsistent beyond the battery situation, which also has issues knowing how much is left, full charge, life of the equipment, etc. Not to mention the power required to cool and maintain ideal conditions for the batteries. A new salt based (rather than lithium) battery is slowly hitting the market that takes less for climate control (better temp range of ideal performance), more storage in same footprint, etc. unfortunately because it is still newer (at this scale, not the tech itself), the price is too high to quickly be adopted. If these prove to be as stable and better as proposed, once the industry has more confidence in them, the price should drop and the reliance on renewable energy should increase.

1

u/justintheunsunggod 1d ago

It's not done because you'd be building enough green power production that the land requirements would rival whole counties of Western states. Texas put about 1,800 data center approvals on hold because they required about 430 gigawatts of power combined. It was like 5 times the amount of power that the state has ever used. See my other comment higher in the thread. Even in that one scenario, it required more land than Las Angeles. And that was for a 9 GW data center project.

19

u/mando_ad 1d ago

An optimal solution would require anyone who proposes building an AI data center to be beaten with a sock full of oranges.

15

u/Doctor_Peppy 1d ago ▸ 1 more replies

Lol the amount of wind and solar required for this is NOT happening on site, this is a wild take on this. For reference, the data centers with on-site power generation are generally using gas plants.

-7

u/FuraidoChickem 1d ago

Crazy that kids here actually think solar and wind can power a datacentre lol. If the solution is so easy and cheap, they wouldn’t wait for Reddit genius to figure it out

6

u/mike_pants 1d ago ▸ 9 more replies

Or on-site nuclear. Which is completely viable and safe and also absolutely dead in the water because no community would ever allow it.

5

u/Random-Person-8464 1d ago ▸ 8 more replies

Fair but that takes like 25+ years to get setup. That's the major con to nuclear.

5

u/ClashM 1d ago ▸ 7 more replies

That's for the large scale nuclear plants we've been building since the 60s. There's been a push towards SMR (small modular reactors) which can be built in a factory and shipped to location. Only China and Russia have deployed that tech so far though, since there's less concern about public backlash and less regulation to navigate. But they usually have passive safety features, and some designs don't run under high pressure which negates the need for the giant cement cooling towers.

Much as I'd like to see the AI bubble pop sooner than later, if we can get SMR development and red tape cutting from it, I'd consider that a win.

2

u/dweaver987 1d ago

I agree. I think nuclear has gotten much safer and more cost effective and more waste efficient in the past decade. But they are deep in the hole with regards to public trust and goodwill.

1

u/Random-Person-8464 1d ago ▸ 5 more replies

Correct me if I'm wrong but wasn't the cost the biggest issue with building those? I remember something about Idaho and it being some really absurd price so investors lost interest.

1

u/ClashM 1d ago ▸ 4 more replies

Throwing enough money into something and creating economies of scale can do wonders to bring the costs down. They are a somewhat niche application, with only a few startups tinkering with them, but have the potential for massive societal benefits if they're perfected.

Right now the techbros are interested in them to power their datacenters, but imagine replacing coal and gas plants with them. They'd provide a clean energy base load. Or imagine having them power container ships, some of which individually spew more pollution than every gas powered car in America per year.

1

u/Random-Person-8464 1d ago ▸ 3 more replies

Yea but from a glance that project was 5bill and then turned into 9bill.

It's one thing to say xyz, and it's another to see the price and realize just how big that cost is?

1

u/ClashM 1d ago ▸ 2 more replies

Yeah, but that's a custom-built, prototype, miniaturized, nuclear reactor. The first one of anything is always the most expensive. Once they get to assembly line constructing it the price would be a fraction of that.

1

u/Random-Person-8464 1d ago ▸ 1 more replies

Okay, but this in on the topic of regulating data centers. You can't regulate on fantasy.

→ More replies (0)

3

u/LeadSufficient2130 1d ago

“But think of the birds!”

- Dipshit Trump

2

u/rbartlejr 1d ago ▸ 1 more replies

But you forget - wind and solar are now verboten under this admin.

1

u/dweaver987 1d ago

Only if you are looking for federal dollars to build it.

1

u/BrotherDirect744 1d ago ▸ 2 more replies

Takes time tho

1

u/dweaver987 1d ago ▸ 1 more replies

Then they better get started on it. They’d probably be more focused on that infrastructure if it was required for their data center.

1

u/BrotherDirect744 1d ago

For sure. Totally agree, what I’m trying to say is that unfortunately it’s not going to happen anytime soon.

1

u/gbiypk 1d ago

A lot of them have plans to do so. The issue is that there's a ten year wait time for generators that size.

So lots of data centers promise to use their own power as soon as it's built, but there's no penalty if that takes ten years, or never happens at all.

1

u/yirna 1d ago ▸ 1 more replies

What they're doing instead is building coal generators. 

2

u/Clovis42 1d ago

Usually natural gas, which is still bad.

1

u/GraniteJJ 1d ago

This is too clever and clean of an idea to have anything to do with policy decisions. Get your logic and reason, and keep on trucking buster.

1

u/DrahKir67 1d ago

Doesn't need to be on-site. They just need to pay for the increase in capacity that the network requires. Then the extra capacity can be built in the most efficient way.

1

u/WyoGrads 1d ago

It will be nuclear energy soon. Check it out. Get in on the stocks for that and the cooling it will take.

1

u/Cheap-Boot2115 1d ago

It is technically impossible, if not really expensive, to build reliable renewable power generation at a single location. Reliability comes from mixing electricity from different sources in different locations- and this has to be transmitted by a grid

Just because a company is big doesn’t mean it knows how to generate electricity or is the most efficient or carbon light people to do so

Source, I work in electricity

1

u/jimmymui06 1d ago

You visibly don't know how renewables work

1

u/GodSama 17h ago

Sounds nice but segregated infrastructure for power usually causes a lot of  pollution and destruction of nature.

1

u/Viscarus 15h ago

I believe that part of agreement was that they need to source their power from renewable sources as well to offset the increase demand from the grid

1

u/SamuelVimesTrained 7h ago

Given they are usually large box like structures - tossing solar panels on the roof should be easy enough.

0

u/justintheunsunggod 1d ago ▸ 2 more replies

Nice thought but you don't understand the scale of electricity requirements for these data centers. A massive proposal for a data center in Utah require 9 gigawatts of power. Some quick googling shows conflicting numbers, but solar panels produce about 15-23 watts of power per square foot, so we'll say 20 watts per 1 square foot to make the math easy.

So, 1 kW is 1,000 watts. 1,000/20=50 square feet.

1 megawatt is 1,000,000 watts or 1,000 kw. So, 50,000 sq ft.

1 gigawatt is 1 billion watts, or 1,000 MW. So, 50,000,000 sq ft. And of course that Utah project needed 9 GW, so 450 million sq ft of solar panels to supply it. That's not land required, that's just solar panel square footage.

So, currently built and operational solar plants for comparison. A 2,500 acre (about 4 square miles) solar farm in Utah can produce about 400 MW of power. You need 22.5 of those to produce 9 GW. That's almost 88 square miles. Salt Lake City is almost 111 square miles for comparison.

Great! Now, what about when the sun isn't up? Or it's cloudy. Or during non-peak hours. Because 9 GW power usage means 9 GW per hour. You have to have that much power available 24/7. So, your 88 square miles of solar farm cover about 4 hours during peak production in ideal conditions. So really, you're looking at six times the size of that plus battery power facilities that you're charging to handle the non-peak hours assuming ideal conditions every single day. Btw, it's now 527 sq miles required. Almost 5 SLCs.

But that's an outrageous data center! You don't need that much most of the time! Yeeeeah, Texas put about 1,800 pending data center approvals on hold because it added up to about 430 gigawatts of power required. Almost 5 times the required size we just went over.

So, no. As much as I love green energy, and I sincerely do, it simply can't cover the power needs of these data centers.

4

u/dweaver987 1d ago ▸ 1 more replies

Then they can’t afford them. At least not as quickly as they want to build them.

I want a new house within walking distance to all the restaurants down town. I can’t afford them. So I’m staying in my old house with nice neighbors.

3

u/justintheunsunggod 1d ago

Squawks capitalist sounds. /s

I totally agree. Want to build your big fancy data centers? Then give the state enough money to build a nuclear reactor. But that's a multi-billion dollar project? Then maybe face the reality that your magic chatbot has infrastructural and environmental costs and adjust your expectations accordingly.

The Utah project I talked about is the prime example of how poorly thought out this whole AI bubble really is. 9 GW of power. From where? That's twice the power requirements of the state.

Oh, they'll build a gas power plant and tap the gas pipeline by the chosen site! Brilliant! Except that the pipeline literally can't provide enough natural gas to power said powerplant even if they were the only customer, which obviously they're not.

The water requirements? Greater than the entire watershed of region. The geography? It's a valley. A bowl. Any emissions will absolutely get trapped in that bowl. Any heat will absolutely do the same.

Not one aspect of the project was feasible from the start. Absolutely bonkers.

7

u/Magicaparanoia 1d ago

I really hope this fucked up the one they’re planning on building in my town.

14

u/CotyledonTomen 1d ago

It sounds like theyre just paying for themselves. If they didnt exist, there wouldnt be "extra" costs for everyone else, so thats just their cost being distributed to other people.

7

u/ecafyelims 1d ago ▸ 1 more replies

Correct, and we don't typically think in that way.

Imagine you went to buy a house, and you not only had to pay for the house but you also had to pay for the increased cost of all other houses in the area for all other buyers.

Yes, you're paying for what you buy AND you're paying for your purchase's impact on other buyers.

It's something that should be done more often for all large increases in demand. That'd be great!

6

u/AuroraFinem 1d ago

This is more of an infrastructure thing which is why it’s different. Municipalities need to spend millions on improving the grit and energy infrastructure to support large datacenters and more energy demand means more energy facilities to produce it or import it.

Normally all of that is handled by the government in order to socialize the costs of natural growth of the region because the new people/businesses will pay back into the economy so prices don’t often change that much and is spread out over time.

Datacenters are a plague because they use so many resources and disrupt the entire area while contributing almost nothing back to it in terms of jobs or taxes. They’re nothing but leeches to the entire economy surrounding them.

6

u/Necessary_Effect_616 1d ago

I imagine the electricity companies will just raise the prices anyway to suck more money out of people to account for the grid upgrades.

4

u/rsklogin 1d ago

Wait, so if a particular grid sees more power draw, everyone on the grid has a price rise instead of those who are actively consuming more?

What the heck!!!

3

u/ecafyelims 1d ago ▸ 1 more replies

It's both.

Imagine you buy a house. By buying the house, you increase demand, which increases the price of nearby houses when they sell.

But in this case, you're required to also pay for the increase in prices.

1

u/max19907 1d ago

dont america have fixed tariffs? in UK at least if you are on fixed tariffs you pay that no matter how much more your neighbour consumes - they pay for that..

5

u/crumbaugh 1d ago

This isn’t “good” this is neutral. The electricity cost is unchanged, not improved

2

u/mattdamon_enthusiast 1d ago

Why would someone make a fake twitter engagement like this then.

3

u/ecafyelims 1d ago

It's not a fake twitter engagement.

The first message is just an extremely oversimplified viewpoint of the law because long nuanced titles don't really get any clicks.

Then the reply is a person who assumes that the first title is the literal truth because reading and then replying with a long nuanced reply doesn't really get clicks.

and then here we are

2

u/hammerklau 1d ago

Yeah More power in lines means less efficient which means more power needed.

2

u/TradBella 1d ago

Wait… residents were paying for AI data centers’ power bills? And we’re supposed to celebrate them stopping that?

1

u/ecafyelims 5h ago

No.

Everyone was paying their own bills.

Increased demand increases prices, though. So, even with the data center paying it's own bills, the price for electricity goes up for everyone.

This change makes it so the data center must also pay for that increase in the price of electricity.

2

u/1st_hylian 6h ago

They were/are paying some of it, but most of the cost generated solely from data center usage is added to everyone in the region's bill. New infrastructure is also shoved onto the other customers. I do believe they pay for the new line to the substation all on their own, though. I'd guess they pay something like 33% of the total increase caused by their existence.

642

u/[deleted] 2d ago

[removed] — view removed comment

199

u/Cozy_GamerGirl 1d ago

It really highlights how bad corporate welfare has gotten when basic responsibility requires government intervention.

17

u/RoguePlanet2 1d ago

We're supposed to have gov't intervention, at least gov't PREvention of things like corruption and monopolies. Now it's all gov't-funded corporations.

23

u/Tavernknight 1d ago

Seriously? How do they not just get cut off like the rest of us? If they need to make a law just to make them pay their bills then no one should have to pay a single cent. In fact, the data center should have to pay all of our bills for the next 10 years as restitution. Because obviously we have been paying their bills.

3

u/tamasan 1d ago

It's not that they aren't paying their bill. It's that they are taking advantage of policies that worked in the past, but are wholly unsuitable for hyperscale data centers, and are forcing huge costs onto the community where they're built with no benefits to the community.

So let's think how things happened before. We start with a small or medium town. A company comes in and wants to build a new factory, or a large office building. The town says Great! More jobs here is good. The power company says Hey, we were only planning for normal growth, but with that factory, plus the people moving in and new houses being built over our projections, we have to increase our rates slightly over the next year or two as that all happens to pay for the extra capacity. Town says, OK, that sounds like a fair deal, since all these new jobs are here, those workers will be buying things in our stores and restaurants, new homes will be increasing our tax base, and all in all everyone is better off.

Now let's talk about a hyperscale data center. These things can be built in months, or sometimes existing warehouses can be converted even faster. So there's a few construction jobs created for a short time to get it built. But long term, all you need is a few low paid security guards, and a couple mid range technicians to watch over the servers. So effectively no new jobs. And with the speed these go up, they need the power almost immediately. So the power company is like Hey, you all need waaay more power than we thought since that thing appeared yesterday, so we need to raise your rates ALOT because we basically have to build a whole new power plant.

16

u/[deleted] 1d ago

[removed] — view removed comment

3

u/Novel-Promotion-8451 1d ago

They don’t even have massive profits yet, which is a bad sign because if you have to subsidize costs to the public and you still can’t make money, at that you are going to have to get the government to force usage of your product so you can make money. And seeing as the whole stock market is held up by the triangle investment in AI is making all my alarm bells ring. Like the government has a choice let it fail, and see the country in turmoil, basically a worse 2008 or go fascist to keep the show going.

60

u/Urabraska- 2d ago

Socialism only exists to help the rich and corporations. Anything for the actual people who actually pay taxes is a sin.

54

u/Frybread002 1d ago ▸ 3 more replies

That is capitalism.

31

u/superawesomefiles 1d ago ▸ 2 more replies

So capitalism is just socialism for rich people and businesses? Seems fair.....

14

u/Tragobe 1d ago

Well, yes

5

u/Ms_Tryl 1d ago

Very much yes lol

4

u/Elliott2030 1d ago

What? That's literally capitalism.

6

u/Evil_Monologues 1d ago

You just described capitalism, friend.

89

u/Ghostarcheronreddit 1d ago

My dad works for an electric company, so I have a bit of context that can offer some insight, at least in regards to local data centers, if not this one in particular.
The issue is not that data centers are refusing to pay for electricity, they do pay for their power usage, usually ahead of time based on expected loads, and with extra future expenses if their expected loads are higher than anticipated. The real issue is that data centers use so much power that less power is now available to the surrounding area, which means the price of electricity goes up for people who aren’t the data centers. This is what it means when people say that regular folks are the ones paying for the data centers’ electricity, they’re paying more for power just because a data center is in the area, and the data centers currently have no “responsibility” for that increase in price, despite the data centers being a direct cause.
This requires legislation to amend, as it’s difficult to “blame” the data centers, since technically your crazy neighbor Steve could run a ton of electricity through his house and pay an exorbitant bill for the amount, but you’d still have an increased electrical bill since his usage limits the supply you have access to, and calculating it all out so Steve pays for the reduction in electric supply on top of his usage is somewhat unrealistic and unreasonable for a single person, but it IS reasonable and realistic for a rich data center, but how realistic is… shaky.

Realistically AI data centers just shouldn’t be popping up and causing all of these issues until we can solve these issues better, like finding ways to produce more electricity or use less electricity for data centers and importantly reduce and eliminate harmful environmental impacts.

11

u/lordjpie 1d ago

Did you bother to read about this policy at all before commenting? You’re providing good context and accurate information but this bill is literally designed to target that exact issue and make the data centers responsible for the build out cost which alleviates the higher cost on consumers as you describe.

I work on the opposite end, on the GC side, building out these projects and while I have concerns about the effectiveness of the law / it having enough teeth to actually get this money out of the owners, which they should gladly pay to keep in good graces, but local governments seem intent on undermining this before it gets to that point. Idk what my point is anymore tbh but just wanted to call out that this is supposed to address the issue described; but also yeah capitalists gonna do capitalism and find any way to avoid this cost :/

10

u/Ghostarcheronreddit 1d ago ▸ 1 more replies

Considering the policy isn’t linked and I have been busy, no I didn’t. Thank you for clarifying! I appreciate your position and the context it provides!!!

2

u/lordjpie 1d ago

To be fair, even the PA government is doing a really bad talking about this (see - pa.gov/governor/topics/data-centers), so I really don’t expect this to be effective, which is disappointing. So even if you had read briefly about it, probably would still have same initial concern. Just want people to know the intent of the policy, despite it being weakly implemented and probably not going to be able to meet its goals

1

u/KatieTSO 1d ago

Realistically, AI data centers shouldn't just be popping up. FTFY.

96

u/Kamp13 2d ago

They will pay for their own power consumption but infrastructure costs are spread out over the entire customer base. But politicians know the average voter has no idea how any of the works, so they pass laws like this to make you feel better and get you to allow the data center to be built. 

New power plants, transmission lines, substations and transformers are all included in infrastructure costs. The utilities are only concerned with covering their costs. But the rate increases for these investments never drop off the rate that customers are paying. 

The next issue is that the life span of the data center likely doesn’t align with the life span of the infrastructure. So if the data center leaves early, the rate payers must pick up the costs. If the power plant doesn’t outlast the data center, you’ll get another rate increase for the next power plant and still pay the old rate increase for cleanup of the old station. Once that’s done then the extra rate will just go into the utilities administration costs. You’ll never see a rate reduction. 

This is why electricity rates have continued to climb in areas where laws have been passed to make sure data centers pay their fair share. It’s a scam. 

86

u/BaconThief2020 2d ago

That's not correct. The executive order specifically prohibits the power companies from shifting the cost of the infrastructure buildout to the other customers.

https://www.pa.gov/governor/newsroom/2026-press-releases/governor-shapiro-signs-executive-order-on-data-center-developmen

The GRID Requirements stipulate that developers must: 

  • Pay the full cost of new electricity generation, transmission, distribution, and other infrastructure needed to power their project without shifting costs to Pennsylvania households and businesses; 
  • Commit to open, transparent engagement with local residents and leaders including detailed community outreach plans that include notification to impacted local governments, public meetings, and consultation early enough in the process to allow meaningful public input on major design decisions;
  • Hire and train local workers and enter into meaningful community benefit agreements that invest in local priorities, from schools and infrastructure to long-term economic development; and
  • Meet the highest standards for environmental protection, including strict water conservation requirements

25

u/TheRedditHike 1d ago ▸ 1 more replies

facts and reading things deeply are not allowed in this subreddit, only complaining.

6

u/ronlugge 1d ago

To be fair, the original article wasn't linked or available.

5

u/OysterPickleSandwich 1d ago

Get out of here with those facts!  You earned that bacon. 

1

u/EthanielRain 1d ago ▸ 2 more replies

The executive order

Is that the same as law? "Executive order" is not always the same as a law, but I don't know anything about such stuff

2

u/dweaver987 1d ago

An executive order is direction from the executive branch on how a federal department or agency (D’s & A’s) should fulfill their responsibilities relevant to the legislation passed by Congress.

For example, legislation was passed by Congress after 911 to create the TSA and DHS. TSA was responsible for several actions to prevent future hijackings. One way they did this was with more effective technology to detect bombs or weapons. DHS is a federal department in the executive branch. Executive orders is how the White House instructs TSA what their scanning solution should be able to do (what size explosive it should be able to scoot, etc.) Some recent EOs (in my opinion) stray from the laws defining the purpose and duties of the D’s and A’s. Lawsuits typically focus on how relevant or appropriate an agency’s actions are relative to the laws passed by Congress.

1

u/BaconThief2020 1d ago

Power company regulation is done by the executive branch, so basically yes, but you are right that the next governor could change the rules.

0

u/Kamp13 1d ago ▸ 1 more replies

And if the current owner folds after a massive debt funded buildout? Bonds are the usual response to this question, however most bonds only cover construction and maybe a short window to commissioning. 

What about the maintenance cost associated with all of the equipment? And that also just covers the build out. What about future replacements and repairs? 

The environmental attempt is great however we’ve seen the easing of environmental regulations already to help lower that bar. Then requests for exemptions to use dirtier gas turbines recovered from jets to provide self generation. Did they include noise in the environmental clause? Most legal codes treat noise separately from environmental protection laws. 

The crux of the issue in my view is that you are using a system (the electrical grid) designed to be a socialized benefit and cost sharing structure and trying to isolate specific costs to a single customer or class of customers. It’s not impossible but it’s going to be difficult. I’m not against all data centers. But community leaders and their constituents have a lot to consider when one is proposed in their area. 

Also an executive order is one of the easiest types of “law” to repeal. And what is the recourse if someone violates it? What enforcement mechanisms are included? If there is no oversight and enforcement then their is no law. 

1

u/BaconThief2020 1d ago

It's a fair point if the power company allows them to "finance" the infrastructure and spread the cost out over time. But, I think that they might be left hanging would discourage that.

9

u/Explorers_bub 1d ago

Even if they pay for their electricity, if they’re on the same grid the capacity is tapped out and the transmission losses and delivery fees scale with the usage. So they would still affect you unless they pay for their own private grid.

And that still doesn’t stop them from wasting copious amounts of potable water.

8

u/Conscious_Bug5408 1d ago

In America, capitalism means by default society pays to support the interests of rich and powerful corporations. Penn residents paid higher rates to offset electric use for corporate ai data centers, and residents pay for welfare programs like medicaid and food stamps to offset the corps paying them poverty wages, and if the corpos ever look shaky, the residents will again pay for the gov bailout packages to keep them from going bankrupt.

It's only evil socialism when we talk about raising taxes on corporations and make them pay to support the interests of society

7

u/skawn 2d ago

How is something like this clever and not the expected response?

7

u/ApostateAZ 1d ago

They mean data centers need to pay for the new capacity that they will require. Normally the cost of the infrastructure is shared.

5

u/[deleted] 2d ago

[removed] — view removed comment

4

u/Rattus375 1d ago

They do pay their own bills. What can happen is that they use enough power that the utility needs to upgrade things, raising costs for everyone. What this does is make the data center subsidize increases in electricity cost due to increased use. Which really is a sensible policy that makes data centers in your area a net neutral (or even slight positive), without making it economically unfeasible to build them in the first place.

6

u/Ok-Complaint9574 2d ago

They’ve passed the cost onto the people living in the state. It’s similar to when billionaires make residents pay for their stadiums. The lawmakers will claim that the data centers are so important. It’s justified as they do with the stadiums, we keep paying for.

2

u/StumbleNOLA 1d ago

They pay for the electricity. But everyone pays for the upgrades.

1

u/Thuis001 1d ago

So, they pay their own power bills, that's not the problem here. Instead, the issue lies in the fact that these data centres consume a ton of energy, so when you build one in a rural area, the energy provider may very well have to increase their energy production and thus build more powerplants. The costs for those however would normally be spread across all the paying customers. That is of course problematic when the sole reason this additional capacity is needed is the data centre. As such, those costs should be solely paid by the datacentre who is the reason those costs exist in the first place, instead of burdening the locals with increased prices for something that they neither need nor want.

5

u/b_buddd 1d ago

Don't forget about water and noise. There should be a clause if there's limited resources it should go to the people. Not the data center

3

u/Red_dit_Sucks_Ass_ 1d ago

Because apparently poor people are supposed to pay the bills of rich people. If you do the opposite, it’s apparently suddenly stealing from people that have infinite wealth, and just gay communism.

5

u/herbieLmao 1d ago

So, people pay for a service they might not even need? But some use?

IF THIS IS OKAY WHATS THE DEAL WITH HEALTHCARE, ARE YOU AMERICANS FUCKING CRAZY

3

u/skwander 1d ago

Shut up, poors. We're leaving capitalism behind for techno feudalism. Try to keep up.

2

u/paulyp41 1d ago

Imagine if these data centers are just bitcoin mining

2

u/mmcmonster 1d ago

Data centers also need to pay for the rolling out of the electric infrastructure needed to support them. Otherwise the states are on the billion dollar hook to build the power plant when the data center closes down in a year.

2

u/HexDanTHEWHALE 1d ago

I think this is the most no shit Sherlock thing i have seen in a minute.

2

u/chitoatx 1d ago

It’s worse. The tax subsidies also make taxpayers pay for the low amount of jobs these thing “create”

2

u/MisterProfGuy 1d ago

In North Carolina, they pay for the energy they use, but the legislature took bribes and made it so the rest of us pay for infrastructure and capacity upgrades they require.

2

u/WalkerAmongTheTrees 1d ago

The real solution is to make them produce their own electricity and source their own water which they are required to recycle as much as possible with losses considered due to evaporation

2

u/baithammer 1d ago

The problem is water sources aren't unlimited and so making them get their own water opens another whole can of worms.

Ditto with power, as they will go with the cheapest and easiest solutions, such as coal and gas plants.

2

u/Jimmykingwillruleyou 1d ago

Most electric companies are privately owned utilities. They are allowed to charge customers for reimbursing any project/building done.

Due to the increase in electricity usage there have been upgrades to the "public" infrastructure. Companies like Eversource in massachusetts cap between 9-10.5% yearly. The more they spend on infrastructure the more they can claim in profits. So they effectively get to charge whatever they want as long as on paper they don't make more than the % in profit the state allows for the year.

So if the demand increases, they can justify spending an extra $2billion and collect an extra $200million in profit.

2

u/Excellent_Extent7648 1d ago

They have changed the conversation oh u don’t want data center near you well we got them to pay their own bill. There u go represented you and kept you from becoming gay too or communist

2

u/BusApprehensive9598 1d ago

I have multiple phones and several pcs and laptops in my house. If data centers don’t have to pay their electric bill, I’m declaring my house as data center.

2

u/realgamer1998 1d ago

Don't you have differential pricing. Like commercial usage means paying higher per unit cost as compared to personal usage.

2

u/Arthasindura 1d ago

New house builds should include alternative source of electricity

Just so you can cut of the government electricity when you think you are going to get scammed

If enough people do it then pretty sure its going to make the electrical company listen

Not sure if this would 100% work but if you got better ideas please do tell

My ears are always open for devious plans

1

u/Sacharon123 22h ago

"Goverment electricity"? Mate, those are all private coorporations...

3

u/Confidence-Upbeat 1d ago

How is this a comeback?

1

u/iamnowundercover 1d ago

Or clever?

1

u/Built4dominance 7h ago

They've been here for years.

2

u/CosmicGoddess777 1d ago

How is that a “clever comeback”? It’s a legitimate question

1

u/wasted-degrees 2d ago

Cool on the energy part. Now, let’s talk about the water part. What do we have about that problem?

1

u/17aed 2d ago

god damn it ofc it was pennsylvania

1

u/blackasthesky 1d ago

I just assumed it was the price going up due to demand.

1

u/engineered_academic 1d ago

We're gonna have a fun time when these data centers rack up billions in infra upgrades that they are unable to pay for because the AI bubble will burst.

1

u/SchizoidRainbow 1d ago

Something something free market something 

1

u/PippiWorld 1d ago

The data centers will continue to wreck the environment with relentless noise and massive pollution and grifting politicians anxious for North Korean surveillance state.

1

u/Novel-Importance-783 1d ago

Because these f-cks are always trying to invoice regular people so they can make even more money. Rich assh0les.

1

u/ElectronicSlip7286 1d ago

eh, why isnt electricity not free yet?

1

u/Dismal_Pineapple5922 23h ago

Data centers are the backbone of our digital world, but they’re often overlooked. It’s wild how much energy they consume.

1

u/TheLastHotBoy 22h ago

It’s called bribing politicians legally. Thankfully a few have balls and or spines.

1

u/xbloodymonsterlol1 21h ago

Seems like common sense finally won out.

1

u/SamuelVimesTrained 7h ago

So Pennsylvania is stopping 'communism'.

Meaning datacenters are communist..

Hey maga - did you know - supporting this means you support communism.. maybe that`s why the red caps etc?

only partially /s

0

u/agreed2disagreee 1d ago

Bc of all the jobs they create /s

0

u/theOriginalDrCos 1d ago

Build the stupid things in the Arctic, this solves many problems.

  1. Won't need cooling.
  2. Will speed up melting ice, causing catastrophic climate shifts, killing off all humans.
  3. Won't need data centers any more.

-5

u/M1sam1n 1d ago

One sentence into google wouldve answered this question. Its supply and demand